Seaway Offshore Cables
Meet The New Siem Cable Installation Duo
Pressrelease

The new Siem Cable Installation Duo

23-05-2016

Installation Support Vessel SIEM MOXIE (2014)

Siem Moxie is specially designed for safe transfer of personnel and equipment to offshore installations and foundations. With her active motion compensated Uptime Gangway System© Siem Moxie has achieved up to 54 connections in 24 hours to and from offshore transition pieces.

The Vessel is currently being mobilized and outfitted for her work on the Nordsee ONE IAG (N1) Offshore Windfarm in the North Sea.

 

 

Cable Lay Vessel SIEM AIMERY (2016)

Siem Aimery is designed for submarine cable and subsea umbilical installation, repair and maintenance duties in challenging environments. Her sub-deck cable capacity consists of 1x 2.500t turntable and 1x 1.750t turntable, with a sheltered cable deck and permanent trenching tool.

The Vessel was delivered to Siem Offshore in April 2016 and is currently being mobilized and outfitted for her first job on the Nordsee ONE IAG (N1) Offshore Windfarm in the North Sea.

Siem Offshore Contractors GmbH is an experienced submarine cable installer for the renewable energy market. We utilise our advanced in-house fleet of offshore service vessels to install, repair, and maintain submarine cables. We excel in harsh conditions, minimising weather delays whilst maximising roll-out efficiency.

Offshore Wind Farm inner array grid cable installation on the Nordsee One OWF project as executed by Siem Offshore Contractors during the summer of 2016. The submarine cable installation was performed using the leading Siem cable installation Duo (Siem Aimery - Cable Lay Vessel and Siem Moxie - Installation Support vessel).
jill-falenschek
Want to know more?
Lets have a chat!
Jill Falenschek
Tender Coordinator
+49(0)491-91243-0
jill.falenschek@subsea7.com